NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70
(2005) National Electrical Code
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 280
Technical Standards and Corrective Action
Requirements for Owners and Operators of
Underground Storage Tanks (UST)
49 CFR 192
Transportation of Natural and Other Gas by
Pipeline: Minimum Federal Safety Standards
49 CFR 195
Transportation of Hazardous Liquids by
Pipeline
UNDERWRITERS LABORATORIES (UL)
UL 510
(2005) Polyvinyl Chloride, Polyethylene,
and Rubber Insulating Tape
UL 514A
(2004) Metallic Outlet Boxes
UL 6
(2000; Rev thru May 2003) Rigid Metal
Conduit
1.2
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
SECTION 13110A