Characteristics of each filter media material.
Materials and Equipment
Catalog cuts and other pertinent information on filters, pumps,
tanks, mixers, piping, and flow elements.
Control System
Spare Parts
After approval of the shop drawings, and not later then [_____]
days prior to the start of operation, spare parts data for each
different item of material and equipment specified. The data
shall include a complete list of parts and supplies, with current
unit prices and source of supply.
SD-06 Test Reports
Acceptance Testing
Test reports in booklet form showing field tests performed to
adjust each component and to prove compliance with the specified
performance criteria. Each test report shall indicate the final
position of controls.
performed.
SD-07 Certificates
Materials and Equipment
Manufacturer's certificates attesting that the equipment meets
the specified material and performance requirements.
SD-10 Operation and Maintenance Data
Field Training
Operating and Maintenance Instructions
step-by-step procedures required for system startup, operation and
shutdown. The instructions shall include the manufacturer's name,
model number, service manual, parts list, and brief description of
equipment and their basic operating features. [_____] complete
copies of maintenance instructions listing routine maintenance
procedures, possible breakdowns and repairs, and trouble shooting
guides. The instructions shall include simplified diagrams for
the system as installed. The manual shall require valves be
numbered and tagged and shall provide a schematic indicating the
number of each valve. Each set shall be permanently bound and
shall have a hard cover. The following identification shall be
inscribed on the covers: the words "OPERATING AND MAINTENANCE
INSTRUCTIONS," name and location of the facility, name of the