f. The test unit used in the development of the RTD curves and
bioassay test shall have had a minimum of 20 lamps utilizing the
same lamps, electronic lamp controller, ballast and automatic
level controller as that proposed in the full scale system.
Testing
Report in booklet form, upon completion of testing of the
installed system. Test report shall include field tests performed
to adjust each component and field tests conducted to prove
compliance with the specified performance criteria. Test report
shall indicate the final position of controls.
Site Visits
A written report of the results of each visit by the
manufacturer's representative, including purpose and time of
visit, tasks performed and results obtained.
SD-07 Certificates
Manufacturer's Qualifications
Standard Products
Written evidence that equipment and accessories are products of
a qualified and experienced manufacturer.
Certificate of compliance, as specified.
SD-10 Operation and Maintenance Data.
outlining the step-by-step procedures required for system startup,
normal operation, short- and long-term deactivation, and shutdown.
An introduction and overall equipment description, purpose,
functions, and simplified theory of operation shall be included in
the beginning of the instructions. Instructions shall include the
manufacturer's name, model number, service manual, parts list, and
brief description of each piece of equipment and its basic
operating features. Instructions shall include component layouts,
simplified wiring, and control diagrams for the system as
installed. Performance test data shall be reflected in the
operating instructions.
[Six] [_____] complete copies of maintenance instructions
listing routine maintenance procedures, calibration procedures,
possible breakdowns and repairs and trouble shooting guides, prior
to the start of the training course.
Each manual shall have an index listing the contents and tab
separators between sections. Manuals shall be bound in sturdy
three-ring, loose-leaf binders.