the system; dispersion coefficient; maximum headloss caused by
each bank of lamp modules; lamp module cross-sectional area;
aspect ratio of lamp bank; installation list; manufacturer's
illustrations; and a statement by the equipment manufacturer
listing any exception to or deviations from the contract drawings
and specifications.
Framed Instructions
Proposed diagrams, instructions, and other sheets, prior to
Field Training[; G][; G, [_____]]
A proposed lesson plan of field instruction, 30 days prior to
commencement of scheduled training.
Extra Materials
Parts list including recommended spare parts and maintenance
supplies with current unit prices and source of supply for each
item of operable equipment. List shall include parts recommended
by the manufacturer to be replaced after 1 and 3 years of service.
List special tools, instruments, accessories, and special lifting
and handling devices required for periodic maintenance, repair,
SD-06 Test Reports.
Design Conditions
a. Results of tests done by an independent testing laboratory
showing effective hydraulic design of the reactor, including
headloss calculations.
b. Documentation showing that the type of ballast required for
the particular lamp supplied for the system have performed
successfully for a period of not less than one year.
c. Hydraulic calculations demonstrating compliance with the
specified hydraulic characteristics.
d. Residence time distribution (RTD) data plotted as
concentration versus time, and as cumulative tracer passed versus
time in accordance with EPA 625/1-86/021. The Contracting Officer
reserves the right to require separate tests to be conducted on a
system identical in design to the proposed system if the hydraulic
test data submitted by the manufacturer is determined to be
unacceptable.
e. The results of a bioassay test done on a scaled model of the
full size system by an independent and certified laboratory shall
be submitted to the Contracting Officer. The bioassay results
shall be used to verify the theoretical calculations only and
shall be conducted in accordance with Section 7.3.3.1 of EPA
625/1-86/021. The test protocol and results shall have been
certified by the laboratory which conducted the testing. Tests
performed on similar equipment designs of another manufacturer
shall not be acceptable.