Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Separator; G, [_____]
[
Accessory equipment; G, [_____]]
Submit shop drawings for separator [and accessory equipment]
including principal dimensions, location of fittings and unit
foundation. Include data to verify center of gravity with the
unit empty and filled with water.
SD-05 Design Data
Separator; G, [_____]
[
Accessory equipment; G, [_____]]
Submit analysis, signed by a registered professional engineer,
which indicates that at the calculated overflow rate, the
separator will be provided with the required square meter square
feet of projected plate separation area to achieve the specified
performance under laminar flow (i.e. Reynolds number of less than
500) conditions. Calculations shall take into account the rate of
flow, potential surge flow, influent concentrations, particle
characteristics, fluid temperature, fluid specific gravities, and
pH.
SD-06 Test Reports
Submit results of hydrostatic and dynamic testing.
Inspection
Preoperational test
SECTION 11311
Page 8