complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detention hollow metal doors and frames
Submit details at not less than 1/4 full size for each frame
type, and elevations of door design type at 1:50 3/8 inch equals
one footminimum, show conditions at openings, details of
construction, location and installation requirements of finish
hardware and reinforcements, and details of joints and
connections. Indicate fabrication, erection, anchorage, and
accessory items.
Submit a schedule listing the location of each door and frame
SD-03 Product Data
Detention hollow metal doors and frames
Submit manufacturer's material and fabrication specifications.
SD-06 Test Reports
Door fabrication
Prior to fabrication, submit test report for reinforced flush
door of the type to be provided on this project.
SECTION 11193
Page 4