project requirements will also be at the Contractor's expense and will be
deducted from payments due the Contractor at a rate of [_____] dollars per
test.
1.3.2.7
Pozzolan from Nonprequalified Sources
Pozzolan, if not from a prequalified source, will be sampled at the source
or at the site of the work and will be stored in sealed bins pending
completion of acceptance tests. Pozzolan may be resampled at the site when
determined necessary. All sampling and testing will be performed by and at
the expense of the Government. Release for shipment and approval for use
will be based on compliance with seven day lime-pozzolan strength
requirements and other physical, chemical, and uniformity requirements for
which tests can be completed by the time the seven day lime-pozzolan
strength test is completed. Release for shipment and approval for use on
this basis will be contingent on continuing compliance with the other
requirements of the specifications. If test results of a bin fail, the
contents may be resampled and tested at the Contractor's expense. The
Government will supervise or perform the unsealing and resealing of bins
and shipping conveyances. If tested pozzolan is rehandled at transfer
points, the extra cost of inspection will be at the Contractor's expense.
The cost of testing excess pozzolan in excess of project requirements will
be at the Contractor's expense at a rate of [_____] dollars per test. The
amount will be deducted from payment to the Contractor.
1.3.2.8
[Ground Granulated Blast-Furnace Slag
**************************************************************************
NOTE: If any other cementitious materials,
including silica fume, are to be allowed, an
additional paragraph should be added similar to this
paragraph, with the name of the cementitious
material substituted for "Ground Granulated
Blast-Furnace Slag".
**************************************************************************
Ground granulated blast-furnace slag will be sampled and tests at the mill
or shipping point by and at the expense of the Government to determine that
the material meets the requirements of the specification under which it is
furnished. No ground granulated blast-furnace slag shall be used until
notice of acceptance has been given by the Contracting Officer. Ground
granulated blast-furnace slag will be subject to check testing from samples
obtained at the project site, as scheduled, and such sampling will be by or
under the supervision of the Contracting Officer and at Government expense.
Material not meeting specifications shall be promptly removed from the
site of work.]
1.3.2.9
Chemical Admixtures
The Contractor shall provide satisfactory facilities for ready procurement
of adequate test samples. All sampling and testing of a chemical admixture
will be by and at the expense of the Government. Tests will be conducted
using samples of materials proposed for the project.
1.4
CONSTRUCTION TOLERANCES
**************************************************************************
NOTE: Delete any of the following tables that are
not applicable. Most projects will require several
SECTION 03700
Page 17