Contracting Officer.
Curing and Protection[; G][; G, [_____]]
The curing medium and methods to be used shall be submitted for
review and approval.
SD-04 Samples
Aggregates[; G][; G, [_____]]
Cementitious Materials[; G][; G, [_____]]
Admixtures[; G][; G, [_____]]
Samples of materials for government testing and approval shall
be submitted as required in paragraph PRECONSTRUCTION SAMPLING AND
TESTING.
SD-06 Test Reports
Quality of Aggregates[; G][; G, [_____]]
Aggregate quality tests shall be submitted at least 30 days
prior to start of concrete placement.
Mixer Uniformity
The results of the initial mixer uniformity tests shall be
submitted at least 5 days prior to the initiation of placing.
Tests and Inspections
Test results and inspection reports shall be submitted daily and
weekly as required in paragraph REPORTS.
Unacceptable Concrete
As directed by the Contracting Officer, the Contractor shall
submit a copy of the records and Contractor tests, as well as the
records of the corrective action taken where testing has
determined that concrete in completed panels is unacceptable.
SD-07 Certificates
**************************************************************************
NOTE: Delete the requirements for Certificates for
air entrainment admixtures, other chemical
admixtures, curing compounds, portland cement, and
pozzolan if the optional parts of paragraph
CEMENTITIOUS MATERIALS, ADMIXTURES, AND CURING
COMPOUND, is used.
**************************************************************************
Cementitious Materials[; G][; G, [_____]]
Cementitious Materials, including Cement and Pozzolan, [and
GGBFS], will be accepted on the basis of the manufacturer's
certification of compliance, accompanied by mill test reports that
materials meet the requirements of the specification under which
they are furnished. Certification and mill test reports shall be
SECTION 03373
Page 8