Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Installation Diagrams[; G][; G, [_____]].
As-built installation diagram for each well installed, prepared
by the geologist present during well installation operations,
within [_____] working days of the completion of the well
installation procedure.
SD-03 Product Data
Well Installation Plan[; G][; G, [_____]].
A plan as specified in paragraph WELL INSTALLATION PLAN
describing the drilling methods, sampling, and well construction
and well development [30] [_____] calendar days prior to beginning
submittal of the plan. The plan shall be approved and signed by
an experienced geologist as specified in paragraph QUALIFICATIONS.
Well Material
Catalog data, and name of supplier, for well screens (to
include the screen slot size), casing, riser pipe, filter pack
material, bentonite, cement, centralizers, surface protective
covers, well vaults, locking caps, airline oil filters for
pneumatic drilling, dedicated sampling equipment, pumps, and
chemical specifications on drill lubricants, tracers, disinfecting
agents, and drill fluid additives, if used. Catalog data shall
include any information, written or otherwise, supplied by the
manufacturers or suppliers of the above listed items.
Qualifications
Personnel qualification documentation.
Site Conditions
A copy of all permits, licenses, or other legal requirements
necessary for execution of the work shall be furnished [_____]
working days before commencement of the work.
Geophysical Logging
The Contractor shall prepare a graphic boring log to scale
showing the required details. [Five] [_____] prints of the boring
log drawing shall be submitted within [_____] working days after
completion of the test hole. This drawing shall be used for
determining the well design, design of the filter pack, well
screen location and screen openings.