1.2.2
Water Well
Compensation for the water well will be made at the contract unit price and
will include material, equipment, and labor required to drill, develop,
perform tests, and complete the permanent well. Depth shall be measured as
the total linear distance between ground surface and bottom of hole.
If
the total depth of well is greater than that specified in the contract for
"Water Well," the additional depth will be paid for at the contract unit
price for "Additional Water Well Depth."
1.2.3
Observation Well
Compensation for an observation well will be made at the contract unit
price and will include material, equipment and labor required to drill,
install, and complete the observation well, as well as perform tests and
permanently grout it after use. Depth shall be measured as the total
linear distance between ground surface and bottom of hole. If the total
combined depth of observation wells is greater than that specified in the
contract for "Observation Wells," the additional depth will be paid for at
the contract unit price for "Additional Observation Well Depth."
1.2.4
Geophysical Logging
**************************************************************************
NOTE: Delete this paragraph if not applicable for
the project.
**************************************************************************
The "Geophysical Logging" unit price will include interpretation of the
logs and their delivery to the Government.
1.2.5
Well or Test Hole Decommissioning/Abandonment
Permanent decommissioning/abandonment of wells or test holes will be paid
for only if it becomes necessary to abandon a well or test hole as
specified, and only for work completed and accepted as specified. Payment
will include compensation for drilling, casing removal, well sampling,
materials, cement, mixing of cement, bentonite, and water, pumping of
grout, equipment, removal of foreign objects, and transportation necessary
to abandon the well or test hole and for the required well or test hole
abandonment records.
1.2.6
Site Cleanup
Separate payment will not be made for cleanup of the site. Cleanup will
mean restoring the site to its pre-construction condition, in accordance
with paragraph SITE CLEANUP. Cleanup will be considered part of and
incidental to the drilling, construction, and/or decommissioning of the
well.
1.3
GENERAL REQUIREMENTS
**************************************************************************
NOTE: The geologist must be aware of the
approximate depth of well and length of screen
required to provide sufficient water to fulfill
project requirements and the quality of water to be
expected at that depth. (The Post, or Resident
Engineers office, or local USGS office is a good
SECTION 02521
Page 7