For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Piles
Driving helmets, capblocks, and pile cushions
SD-05 Design Data
Concrete mix design
Submit a concrete mix design before concrete is placed, for each
type of concrete used for the piles.
SD-06 Test Reports
Aggregates
Fly ash
Silica fume
Concrete
Submit concrete cylinder compressive strength test results.
SD-07 Certificates
Precasting manufacturer's quality control procedures
Suitability of pile driving equipment
[
Curing of piles]
SECTION 02395
Page 7