SECTION 01780A
CLOSEOUT SUBMITTALS
05/02
**************************************************************************
NOTE: This guide specification covers the
requirements for closeout submittals including:
revised project documents, warranty management,
testing, adjusting and balancing, O & M manuals, and
final cleaning.
Comments and suggestions on this guide specification
are welcome and should be directed to the technical
proponent of the specification. A listing of
technical proponents, including their organization
designation and telephone number, is on the Internet.
Recommended changes to a UFGS should be submitted as
a Criteria Change Request (CCR).
Use of electronic communication is encouraged.
Brackets are used in the text to indicate designer
choices or locations where text must be supplied by
the designer.
**************************************************************************
PART 1
GENERAL
**************************************************************************
NOTE: Coordinate with the customer regarding
special warranty requirements and options.
**************************************************************************
1.1
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
SECTION 01780A
Page 2