arrangements through the Contracting Officer. The prevailing rate for
cable or wireless is 0.00 per phone. There is no charge for on-island
telephone service. [Current rates are [$_____] per month for each private
telephone line plus an installation charge of [$_____] for each instrument
and [$_____] per month for two-party lines plus [$_____] per month for each
extension. Pay for the cost of the wiring on runs in excess of two spans].
Long distance services are usually available at commercial rates. The
available for use. [Limited teletypewriter circuit service is available.]
][1.6
BACKFLOW TESTER CERTIFICATION
Prior to testing, submit to the Contracting Officer certification issued by
the State or local regulatory agency attesting that the backflow tester has
successfully completed a certification course sponsored by the regulatory
agency. Tester shall not be affiliated with any company participating in
any other phase of this Contract.
**************************************************************************
NOTE: Use for SOUTHWESTNAVFACENGCOM only.
**************************************************************************
Certified by the City of San Diego.
]1.7
WEATHER PROTECTION
Take necessary precautions to ensure that roof openings and other critical
required to seal off such openings when rain or other detrimental weather
is imminent, and at the end of each workday. Ensure that the openings are
completely sealed off to protect materials and equipment in the building
from damage.
1.7.1
Building and Site Storm Protection
When a warning of gale force winds is issued, take precautions to minimize
Precautions shall include, but are not limited to, closing openings;
removing loose materials, tools and equipment from exposed locations; and
removing or securing scaffolding and other temporary work. Close openings
in the work when storms of lesser intensity pose a threat to the work or
[1.7.1.1
[Typhoon] [Hurricane] Condition of Readiness
Unless directed otherwise, comply with:
a.
Condition FOUR (Sustained winds of 93 km/hr 50 knots or greater
expected within 72 hours): Normal daily jobsite cleanup and good
housekeeping practices. Collect and store in piles or containers
scrap lumber, waste material, and rubbish for removal and disposal
at the close of each work day. Maintain the construction site
including storage areas, free of accumulation of debris. Stack
form lumber in neat piles less than one m 4 feet high. Remove all
debris, trash, or objects that could become missile hazards.
[Contact Contracting Officer for [Condition Requirements]
[Condition of Readiness (COR) updates and completion of required
actions].]