NOTE: Use the following option for projects located
in Argentina and the Azores and for Air Force
projects in the Atlantic Division. Use this
paragraph for other activities only when approved by
the activity.
**************************************************************************
[Reasonable amounts of utilities will be made available without charge.
The Contractor will be responsible for making connections, providing
transformers and meters, and making disconnections; and for providing
backflow preventer devices on connections to domestic water lines. Under
no circumstances will taps to base fire hydrants be allowed for obtaining
domestic water.]
**************************************************************************
NOTE: Use the following option only for MCON funded
and non-appropriated funds projects at Marine Corps
Base, Camp Lejeune and Marine Corps Air Station
(Helicopter (H)), New River.
**************************************************************************
[Reasonable amounts of utilities will be made available to the Contractor
at the prevailing Government rates and may be obtained upon application to
the Base Maintenance Officer, Bldg. 1202, Marine Corps Base, Camp Lejeune.
A refundable security deposit to the Resident Officer in Charge of
Construction shall be made prior to application for services. The
Contractor shall be responsible for providing transformers, meter bases,
electrical service poles and drops for electrical services, and backflow
preventer devices on connections to domestic water lines. Final taps and
tie-ins to the Government utility grid will be made by Base Maintenance who
will also provide and seal a 120 or 208 volt, three-wire kWh meter. Tap-in
cost, if any, shall be the responsibility of the Contractor. Tampering or
movement of a sealed meter without notification to base maintenance is
grounds for discontinuance of electrical service. The Contractor shall be
responsible for providing larger meters required if not available from the
Government. The Contractor shall be responsible for the cost of utility
services required until the date of Government acceptance. Under no
circumstances will taps to base fire hydrants be allowed for obtaining
domestic water.]
[1.5.2.1
Utilities at Guam Provided by Contractor for Special Projects
Contact the Government of Guam for water and electricity.
][1.5.2.2
Utility Services at Midway
a.
Potable water is rationed during dry periods and not available for
construction purposes during the months of June and July.
b.
Electrical power available, primary voltage is 2400 volt 3 phase,
3 wire, 60 cycle AC. Secondary voltages may be 120/208 or 120/240
volts.
c.
Provide new meters for potable water, brackish water and
electricity. The cost of utility services furnished may be
reduced by the cost the Government would normally pay for
comparable meters if, at the end of the job, the meters are
delivered to the Government in good condition.