________________________________________________________________________
|
CONTRACTOR
|
|
|
|
(Firm Name)
|
|
|
|
|
|
|
| _____ Approved
|
|
|
|
|
| _____ Approved with corrections as noted on submittal data and/or
|
| attached sheets(s).
|
|
|
|
|
|
|
| SIGNATURE: __________________________________________________________ |
|
|
| TITLE: ______________________________________________________________ |
|
|
| DATE: _______________________________________________________________ |
|
|
|________________________________________________________________________|
For design-build construction, both the Contractor Quality Control System
Manager and the Designer of Record shall stamp and sign to certify that the
submittal meets contract requirements.
PART 2
PRODUCTS
Not used.
PART 3
EXECUTION
Not used.
-- End of Section --
SECTION 01330
Page 28