calculations used in sizing equipment required by these specifications.
Descriptions and calculations shall show how the equipment will operate
with connected systems to meet the performance of this specification. The
data package shall include the following:
a. Receiver, transmitter, MODEM transmit/receive levels, and losses in
decibels (dB) on each DTS circuit.
b. Data transmitter and receiver communication speed and protocol
description.
c. Video and sync signal transmission method and bandwidth of the
transmitter and receiver.
d. Data transmission system expansion capability and method of
implementation.
e. Signal-to-noise ratio calculation on each DTS circuit.
1.3.1.4
System Overall Reliability Calculations
The data package shall include all manufacturer's reliability data and
calculations required to show compliance with the specified reliability.
The calculations shall be prepared using DOD 3235.1-H as a guide. The
calculations shall be based on all equipment associated with one data
circuit and one video circuit, excluding the cable.
1.3.1.5
Certifications
All specified original manufacturer's certifications shall be included with
the data package.
1.3.1.6
Key Control Plan
**************************************************************************
NOTE: The designer will specify the Section title
in which a key control plan is found, when this
specification is used with IDS, ECS or CCTV: Section
13702N BASIC INTRUSION DETECTION SYSTEMS (IDS),
Section 13703N COMMERCIAL INTRUSION DETECTION
SYSTEMS (IDS), Section 13720A ELECTRONIC SECURITY
SYSTEM, Section 13721A SMALL INTRUSION DETECTION
SYSTEM, Section 13801A UTILITY MONITORING AND
CONTROL SYSTEM (UMCS), and Section 16751A CLOSED
CIRCUIT TELEVISION SYSTEMS.
**************************************************************************
The Contractor shall provide a key control plan as specified in Section
[_____].
1.3.2
Group II Technical Data Package
The Contractor shall verify that site conditions are in agreement with the
design package. The Contractor shall submit a report to the Government
documenting changes to the site, or conditions that affect performance of
the system to be installed. For those changes or conditions which affect
system installation or performance, provide (with the report) specification
sheets, or written functional requirements to support the findings, and a
cost estimate to correct the deficiency. The Contractor shall not correct
SECTION 16794A
Page 9