The data package shall include all manufacturers' reliability data and
calculation required to show compliance with the reliability specified in
Section [_____]. The calculation shall be prepared using Section [_____]
as a guide. The calculations shall be based on the configuration specified
in Section [_____].
1.3.1.5
Certifications
All specified manufacturer's certifications shall be included with the data
package.
1.3.2
Group II Technical Data Package
The Group II technical data package is specified in Section [_____].
1.3.3
Group III Technical Data Package
**************************************************************************
NOTE: Insert section number and title for the
specification.
**************************************************************************
The Group III technical data package shall consist of factory testing data.
The Contractor shall prepare a test plan and test procedures in accordance
with Section [_____] for the factory test. The test plan shall describe
the applicable tests to be performed, and other pertinent information such
as specialized test equipment required, length of factory test, and
location of the factory test. The procedures shall explain in detail,
step-by-step, actions and expected results to demonstrate compliance with
the requirements of this specification, and the methods for simulating the
necessary conditions of operation to demonstrate performance of the system.
The Contractor shall deliver the test plan for the factory test to the
Government. After receipt by the Contractor of written approval of the
test plan, the Contractor shall deliver the factory test procedures to the
Government for approval. After receipt by the Contractor of written
approval of the factory test procedures, the Contractor may schedule the
factory test.
1.3.4
Group IV Technical Data Package
1.3.4.1
Performance Verification and Endurance Testing Data
**************************************************************************
NOTE: Insert section number and title for the
specification.
**************************************************************************
The Contractor shall prepare a test plan and test procedures in accordance
with Section [_____] for the performance verification test and endurance
test. The test plan shall describe the applicable tests to be performed,
and other pertinent information such as specialized test equipment
required, and length of performance verification test. The test procedures
shall explain in detail, step-by-step actions and expected results to
demonstrate compliance with the requirement of this specification. The
Contractor shall deliver test plans for the performance verification test
and endurance test to the Government. After receipt by the Contractor of
written approval of the test plans, the Contractor shall deliver the
performance verification test and endurance test procedures for approval.