NOTE: If the NCAV System is to be procured as part
of a facility construction project contract, include
item "c." below.
**************************************************************************
a.
Installation of system cabling shall be by the qualified Installer.
b. System cables shall be installed without kinks, sharp bends or
deformations, in a manner to prevent abrasion.
[c. System cabling shall be installed in cable trays, conduits and boxes
specified in Section 16402 INTERIOR DISTRIBUTION SYSTEM.]
3.3.4
Grounding
Equipment enclosures and all other non-current carrying metal parts of
electric equipment shall be grounded.
3.3.5
Related Trades
**************************************************************************
NOTE: If the NCAV System is to be procured as part
of a facility construction project contract, include
this.paragraph.
**************************************************************************
a. Coordinate all efforts with those of related trades. In the event of
any conflicts, delayed or improper preparatory work by Others, notify the
Contracting Officer for resolution. The Contracting Officer decision shall
be binding.
b. The Electrical Contractor for the project shall furnish and install all
cable trays, conduits, boxes, grounding system and buss bars, and all
primary ac power wiring required to accommodate the installation of the
system specified in this Section.
c. Coordinate the system cable routing with the cable routing of other
systems to assure that there will not be any EMI problems that will
adversely affect the performance of this system or any other specified
project system.
3.3.6
Infrastructure and Rough-in: Facility Construction Project
**************************************************************************
NOTE: If the NCAV System is to be installed in a
facility construction project (new, addition or
renovation), but is to be procured by the Government
directly from a system Contractor and completely
separate from the facility construction project
contract, then include this paragraph.
**************************************************************************
a. Coordinate all efforts with those of related trades that have provided
the infrastructure and rough-in, as indicated below, in the facility
construction project to accommodate the installation of the system. In the
event of any conflicts, delayed or improper preparatory work by Others,
notify the Contracting Officer for resolution. The Contracting Officer
decision shall be binding.