and all component products.
Maintenance Service[; G][; G, [_____]]
For maintenance service after the warranty period, the system
Contractor shall submit a service agreement proposal to the
medical facility.
SD-04 Samples
Product Samples[; G][; G, [_____]]
**************************************************************************
NOTE: If the Design Agency or Using Service
requests samples, include this submittal.
**************************************************************************
One sample unit of each type of station and light for approval.
SD-05 Design Data
requirements for each Major Functional Component of the system in
accordance with the Manufacturer's instructions, and the
worst-case power loading conditions.
b. Analysis and calculations to define the type and size of all
cables for each system in accordance with Manufacturer's
instructions and power drop calculations.
c. Analysis and supporting result from specified preparation and
application items, and all coordination items. Includes
definition of all interface protocols.
d. AC power consumption and heat dissipation data under both
normal and maximum operating conditions.
SD-06 Test Reports
Acceptance Test Plan[; G][; G, [_____]]
Step-by-step actions and the expected results to demonstrate
system compliance with the requirements of this specification.
Include tests defined in the Manufacturer's installation
instructions; list of all test equipment to be used, including
data indicating that calibration of the test equipment is current;
test data sheets;.and names and qualifications of the person(s)
who will perform the tests.
Acceptance Test Report[; G][; G, [_____]]
form. Test reports shall indicate all field tests performed to
adjust each component and to prove compliance with the specified
performance criteria. Each test report shall indicate the final
position of controls and operating mode of the system, and the
Manufacturer, model number, and serial number of the test
SECTION 16730A
Page 10