relationships among all of the components of the system
and all interfaces provides the specified capability
and performance.
Telecommunications
Systems
Security systems installed in the facility. This does
NOT include Fire Alarm Systems, Environmental Control
Systems, and Special Building Alarm Systems.
Telecommunications
Rooms
Controlled environment rooms on each floor level that
provide the floor and wall space for the mounting of
equipment and cable distribution terminations and
devices for all telecommunications systems.
24x7 Staffed
A workplace that is constantly staffed 24 hours per
day, 7 days per week, 365 days per year.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
SECTION 16730A
Page 8