Government.] The following shall be submitted in accordance with Section
01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Lighting and Visual Navigation Aids
Composite drawings showing coordination of work of one trade
with that of other trades and with the structural and
architectural elements of the work. Drawings shall be in
sufficient detail to show overall dimensions of related items,
clearances, and relative locations of work in allotted spaces.
Drawings shall indicate where conflicts or clearance problems
exist between the various trades.
As-Built Drawings
Drawings, as specified.
SD-03 Product Data
Materials and Equipment
1) A complete itemized listing of equipment and materials
proposed for incorporation into the work. Each itemization shall
include an item number, the quantity of items proposed, and the
name of the manufacturer.
2) Data composed of catalog cuts, brochures, circulars,
specifications and product data, and printed information in
sufficient detail and scope to verify compliance with requirements
of the contract documents shall be included.
Protection Plan
Protection plan as specified.
Training
Requirements of training shall be provided [_____] weeks before
training is scheduled to begin.
Special Tools
List of special tools and test equipment required for
maintenance and testing of the products supplied by the Contractor.
List of Parts
A list of parts and components for the system by manufacturer's
name, part number, nomenclature, and stock level required for
maintenance and repair necessary to ensure continued operation
with minimal delays.
Maintenance and Repair
Instructions necessary to check out, troubleshoot, repair, and
replace components of the systems, as specified.
SECTION 16526A
Page 11