j.
Dielectric Voltage-Withstand (Repeated)
k.
Withstand
l.
m.
Closing
n.
Dielectric Voltage-Withstand (Repeated)
o.
Strength of Insulating Base and Support
2.5.1
Viewing Ports
ATS and BP/IS switches shall be of draw-out construction. Viewing ports to
inspect the contacts without requiring disassembly shall be provided.
2.5.2
Operating Handles
The operating handles shall be externally operated, and designed and
constructed not to stop in an intermediate or neutral position during
operation, but shall permit load by-pass and transfer switch isolation in
5 seconds or less. The transfer speed will be independent of the
operational speed of the switch handle or handles.
PART 3
EXECUTION
3.1
INSTALLATION
ATS shall be installed as shown and in accordance with approved
manufacturer's instructions.
3.2
INSTRUCTIONS
to cabinet where operator can see them. One-line and elementary or
door.
3.3
SITE TESTING
**************************************************************************
NOTE: Design should incorporate ATS testing in
overall test of complete emergency system under
reference if not required.
**************************************************************************
Following completion of ATS installation and after making proper
adjustments and settings, site tests shall be performed in accordance with
manufacturer's written instructions to demonstrate that each ATS functions
satisfactorily and as specified. Contractor shall advise Contracting
Officer not less than 5 working days prior to scheduled date for site
testing, and shall provide certified field test reports within 2 calendar
weeks following successful completion of site tests. Test reports shall
describe adjustments and settings made and site tests performed. Minimum
a.
Insulation resistance shall be tested, both phase-to-phase and
phase-to-ground.
b.
Power failure of normal source shall be simulated by opening
upstream protective device. This test shall be performed a
SECTION 16410A
Page 16