2.3.2
Cleaning and Painting
Both the inside and outside surfaces of an enclosure, including means for
fastening, shall be protected against corrosion by enameling, galvanizing,
plating, powder coating, or other equivalent means. Protection is not
required for metal parts that are inherently resistant to corrosion,
bearings, sliding surfaces of hinges, or other parts where such protection
is impractical. Finish shall be manufacturer's standard material, process,
and color and shall be free from runs, sags, peeling, or other defects. An
enclosure marked Type 1, 3R, 4 or 12 shall be acceptable if there is no
visible rust at the conclusion of a salt spray (fog) test using the test
method in ASTM B 117, employing a 5 percent by weight, salt solution for 24
hours. Type 4X enclosures are acceptable following performance of the
above test with an exposure time of 200 hours.
2.4
TESTING
2.4.1
Factory Testing
A prototype of specified ATS shall be factory tested in accordance with UL
1008. In addition, factory tests shall be performed on each ATS as follows:
a.
entire system.
b.
c.
Visual inspection to verify that each ATS is as specified.
d.
Mechanical test to verify that ATS sections are free of mechanical
hindrances.
e.
Electrical tests to verify complete system electrical operation
and to set up time delays and voltage sensing settings.
2.4.2
Factory Test Reports
Manufacturer shall provide three certified copies of factory test reports.
2.5
FACTORY TESTING (MEDICAL FACILITIES)
**************************************************************************
required for Medical Facilities only.
**************************************************************************
The factory tests for ATS and By-Pass/Isolation switches used in medical
facilities shall be conducted in the following sequence:
a.
General
b.
Normal
c.
Overvoltage
d.
Undervoltage
e.
Overload
f.
Endurance
g.
Temperature Rise
h.
Dielectric Voltage-Withstand
i.
Contact Opening