presence of a QAR is waived, certified copies of the
test reports shall be furnished to the Contracting
Officer.
Test specimens and samples for analysis shall be
plainly marked to indicate the materials they
represent and, if required, they shall be properly
boxed and prepared for shipment.
Except as provided elsewhere, all costs of all test
and trials, excepting the pay and expense of the
QAR, shall be borne by the Contractor and no
separate payment will be made therefor.
Section E
Special Contract Requirements
Include the following:
Contractor's Drawings and Data.
1. The Contractor shall, within [_____] calendar
days after [date of award] [date of receipt by him
of notice of award], submit for approval of the
Contracting Officer outline drawings of all
equipment to be furnished under this contract,
together with weights and overall dimensions to
enable the Contracting Officer to proceed with the
final design of the [powerhouse] [pumping plant]
[navigation lock]. These drawings shall show space
requirements, details of any floor supports to be
embedded in concrete, location of terminal blocks,
and top and bottom conduit entrance areas.
2. The Contractor shall, within [_____] calendar
days after [date of award] [date of receipt of
notice of award], submit for approval such assembly
and detailed drawings and data as required to
demonstrate fully that all parts of the equipment
will conform to the requirements and intent of the
specifications. The drawings and data shall include
applicable schematic diagrams with wire
designations, equipment lists, accessories and spare
parts lists, nameplate schedules, all necessary
descriptive data, and wiring diagrams showing panel
and conductor designations, and external cables.
3. All drawings and data submitted and approved
will form a part of the contract. The sequence of
submission of drawings shall be such that all
information is available for checking each drawing
when it is received.
4. [_____] reproducible, of a quality that will
make legible prints,] [and] black and white copies
or blueprints of each drawing for approval shall be
furnished. Each submission of drawings by the
Contractor must be accompanied by a letter of
transmittal containing a list of drawings giving
SECTION 16404A
Page 6