Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Drawings[; G][; G, [_____]]
Shop Drawings[; G][; G, [_____]]
The Contractor shall, within [30] [_____] calendar days after
[date of award] [date of receipt by him of notice of award],
submit for the approval of the Contracting Officer [six (6)]
[_____] copies of outline drawings of all equipment to be
furnished under this contract, together with weights and overall
dimensions. Drawings shall show the general arrangement and
overall dimensions of the motor control centers, switchboards, and
panelboards. These drawings shall show space requirements,
details of any floor supports to be embedded in concrete and
provisions for conduits for external cables.
Motor Control Centers[; G][; G, [_____]]
**************************************************************************
NOTE: The intent of this submittal is to require
NEMA Class II drawing packages. When it is
desirable for the Government's wire numbers to be
included on the drawings or custom drawing sizes and
title blocks are required, NEMA Class IIS shall be
specified.
Should this specification be used in procurement of
NEMA Class I equipment, the drawing packages are
less involved and the second and fourth sentences
shall be deleted from this paragraph.
**************************************************************************
The Contractor shall, within [30] [_____]calendar days after
[date of award] [date of receipt by him of notice of award],
submit for the approval of the Contracting Officer [six (6)]
[_____] copies of electrical equipment drawings. [The NEMA Class
II[S] motor control center drawings shall include a connection
illustrate operation of associated motor unit controls.] An
arrangement of the control center with interconnecting wiring
shown by lines or by terminal designations (wireless).] A
single-line diagram, equipment list and nameplate schedule shall
be provided for each motor control center.
Switchboards[; G][; G, [_____]]
The Contractor shall, within [30] [_____] calendar days after
SECTION 16403A
Page 11