[date of award] [date of receipt by him of notice of award],
submit for the approval of the Contracting Officer [six (6)]
[_____] copies of electrical equipment drawings. A single-line
diagram, equipment list and nameplate schedule shall be provided
SD-03 Product Data
Equipment[; G][; G, [_____]]
The Contractor shall within [30] [_____] calendar days after
[date of award] [date of receipt by him of notice of award] submit
for approval [six (6)] [_____] copies of such descriptive cuts and
information as are required to demonstrate fully that all parts of
the equipment will conform to the requirements and intent of the
specifications. Data shall include descriptive data showing
typical construction of the types of equipment proposed, including
motor circuit protectors, performance capacities and other
information pertaining to the equipment. [[Six (6)] [____] sets
of characteristic curves of the individual breaker trip element
shall be submitted.]
The Contractor shall submit, within a minimum of [14] [_____]
days prior to the proposed date of tests, [six (6)] [_____] copies
of manufacturer's routine factory test procedures and production
line tests for all motor control centers and switchboards.
SD-06 Test Reports
The Contractor shall submit [six (6)] [_____] complete
reproducible copies of the factory inspection results and [six
(6)] [_____] complete reproducible copies of the factory test
results in booklet form, including all plotted data curves, all
test conditions, a listing of test equipment complete with
calibration certifications, and all measurements taken. Report
shall be signed and dated by the Contractor's and Contracting
Officer's Representatives.
[SD-07 Certificates
**************************************************************************
NOTE: Include this requirement only when
contractual certification is required and Factory
Test Reports without certification are not
acceptable.
**************************************************************************
Motor Control Centers
The contractor shall submit certification of factory test
reports. Certification shall be signed by official authorized to
certify on behalf of the manufacturer, attesting that the motor
control center meets the specified requirements. The statement
must be dated after the award of this contract, must state the