[recommended by the manufacturer] for conductor type and size of conductor
and ruling span indicated.
3.1.6.8
Fittings
Dead end fittings[, clamp or compression type,] shall conform to written
recommendations of conductor manufacturer and shall develop full ultimate
strength of conductor.
3.1.6.9
Aluminum Connections
Make aluminum connections to copper or other material using only splices,
connectors, lugs, or fittings designed for that specific purpose. Keep a
copy of manufacturer's instructions for applying these fittings at job site
for use of the inspector.
[3.1.7
Pole Mounted Metering Equipment
3.1.7.1
Primary Meters
Install primary metering transformers [as indicated] [according to
manufacturer's drawings]. Make connections to metering circuits within
3.1.7.2
Installing Meter System
Metering enclosure shall house kWh meter [and meter test block]. Secure
the enclosure to pole at a height of 1825 mm 6 feet above grade to center
of the enclosure. Ground enclosure.
a.
Connect meter as indicated.
[b.
Connect meter test block between meter and metering transformers
to isolate meter for removal, test or adjustment.]
c.
Phase sequence and color code of potential and current leads shall
be identical. Mark wires which are connected to transformer
terminals identified with polarity marks (dots) by a colored
plastic tape around the wire at each end.
d.
No splices are permissible in metering circuits. Wire shall be
trained at sides and bottom of enclosure back board and secured by
plastic wraps.
]3.1.8
Pole Top Switch Installation
Install pole top switch strictly according to manufacturer's installation
drawings and information.
3.1.8.1
Operating Handle
Locate approximately 1520 mm 5 feet above ground on field side of pole.
[3.1.9
Recloser
Install recloser(s) strictly in accordance with manufacturer's instructions.
SECTION 16301N
Page 37