A site visit letter stating the date the site was visited and
listing discrepancies found.
SD-06 Test Reports
Onsite Inspection and Tests[; G][; G, [_____]]
a. A letter giving notice of the proposed dates of all onsite
inspections and tests at least [14] [_____] days prior to
beginning tests.
b. A detailed description of the Contractor's proposed
procedures for onsite tests including the test including the test
plan and a listing of equipment necessary to perform the tests.
Submission shall be at least [_____] days prior to beginning tests.
c. [Six] [_____] copies of the onsite test data described below
in 216 x 279 mm 8-1/2 x 11 inch 3-ring binders with a separate
section for each test. Sections shall be separated by dividers
with tabs. Data plots shall be full size 216 x 279 mm 8-1/2 x 11
inches minimum), showing all grid lines, with full resolution.
(1)
A description of the procedures for onsite tests.
(2)
A list of equipment used, with calibration certifications.
(3) A copy of measurements taken, with required plots and
graphs.
(4)
The date of testing.
(5)
The parameters verified.
(6)
The condition specified for the parameter.
(7)
The test results, signed and dated.
(8)
A description of all adjustments made.
SD-07 Certificates
Vibration Isolation
Torsional analysis including prototype testing or calculations
which certify and demonstrate that no damaging or dangerous
torsional vibrations will occur when the prime mover is connected
to the generator, at synchronous speeds, plus/minus 10%.
Prototype Tests
Manufacturer's standard certification that prototype tests were
performed for the generator model proposed.
Documentation which cites engines and generators in similar
service to demonstrate compliance with the requirements of this
specification. Certification does not exclude annual
SECTION 16264A
Page 12