k.
Layout of each panel.
l. Mounting and support for each panel and major piece of
electrical equipment.
m.
Engine-generator set lifting points and rigging instructions.
1.4.20
Spare Parts
The Contractor shall submit a complete list of spare parts for each piece
of equipment and a complete list of all material and supplies needed for
continued operation. Lists shall include supply source and current prices.
Each list shall be separated into two parts, those elements recommended by
the manufacturer to be replaced after 3 years of service, and the remaining
elements.
1.5
STORAGE AND INSTALLATION
The Contractor shall properly protect material and equipment, in accordance
with the manufacturers recommended storage procedures,before, during, and
after installation. Stored items shall be protected from the weather and
contamination. During installation, piping and similar openings shall be
capped to keep out dirt and other foreign matter.
PART 2
PRODUCTS
2.1
MATERIALS AND EQUIPMENT
2.1.1
manufacturer's standard.
2.1.2
ANSI C12.11.
2.1.3
Revenue Metering
IEEE C57.13.
2.1.4
Pipe (Sleeves, Fuel/Lube-Oil, Compressed Air, Coolant, and Exhaust)
ASTM A 53/A 53M, or ASTM A 106/A 106M steel pipe. Pipe smaller than 50 mm
2 inches shall be Schedule 80. Pipe 50 mm 2 inches and larger shall be
Schedule 40.
a.
Flanges and Flanged Fittings: ASTM A 181/A 181M, Class 60, or
ASME B16.5, Grade 1, Class 150.
b.
Pipe Welding Fittings: ASTM A 234/A 234M, Grade WPB or WPC, Class
150 or ASME B16.11, 1360.7 kg 3000 lb.
c.
Threaded Fittings:
ASME B16.3, Class 150.
d.
Valves:
MSS SP-80, Class 150.
SECTION 16263A
Page 35