For Unit Heater:
[_____]
Checklist Item
Q
M
E
T
C
D
O
U
Installation
[a.
Hot water piping properly connected.
___ ___
X
___ ___ ___ ___ ___]
[a.
Steam and condensate piping properly
connected.
___ ___
X
X
X
___ ___ ___]
[b.
Hot water piping pressure tested.
___ ___
X
___ ___ ___ ___ ___]
[b.
Steam and condensate piping pressure
tested.
___ ___
X
X
X
___ ___ ___]
c.
Air vent installed on hot water coil
with shutoff valve as specified.
___ ___
X
X
X
___ ___ ___
d.
Any damage to coil fins has been repaired.__ ___
X
___
X
___ ___ ___
e.
Manufacturer's required maintenance/
operational clearance provided.
___ ___
X
X
X
___ ___ ___
Electrical
a.
Power available to unit disconnect.
___ ___ ___
X
___ ___ ___ ___
b.
Proper motor rotation verified.
___ ___ ___
X
X
___ ___ ___
c.
Verify that power disconnect is located
within sight of the unit it controls.
___ ___ ___
X
___ ___ ___ ___
d.
Power available to electric heating coil.___ ___ ___
X
___ ___ ___ ___
Controls
a.
Control valves properly installed.
___ ___
X
___ ___ ___ ___ ___
b.
Control valves operable.
___ ___
X
X
___ ___ ___ ___
c.
Verify proper location and installation of
thermostat.
___ ___
X
___ ___ ___ ___ ___
Testing, Adjusting, and Balancing (TAB)
a.
TAB Report submitted.
___ ___
X
___
X
___ ___ ___
SECTION 15995A
Page 26