For Computer Room Unit:
[_____]
Checklist Item
Q
M
E
T
C
D
O
U
a.
Control valves operable.
___ ___
X
X
___ ___ ___ ___
b.
X
___ ___ ___ ___
c.
Verify proper location and installation of
thermostat and humidistat.
___ ___
X
___ ___ ___ ___ ___
Testing, Adjusting, and Balancing (TAB)
a.
Construction filters removed and replaced.__ ___
X
___
X
___ ___ ___
b.
TAB results within limits specified in
Section 15990A
___ ___ X
___
X
___ ___ ___
c.
TAB Report submitted.
___ ___
X
___
X
___ ___ ___
SECTION 15995A
Page 29