under the direct guidance of the TAB Specialist. The TAB specialist is
required to be onsite on a daily basis to direct TAB efforts. The TAB
Specialist shall participate in the commissioning process specified in
Section 15995ACOMMISSIONING OF HVAC SYSTEMS.
PART 2
PRODUCTS (Not Applicable)
PART 3
EXECUTION
**************************************************************************
NOTE: The planning and programming of either Title
II services or in house support will be required
where the participation of a design team member is
required for TAB during construction.
**************************************************************************
3.1
DESIGN REVIEW
The TAB Specialist shall review the Contract Plans and Specifications and
advise the Contracting Officer of any deficiencies that would prevent the
effective and accurate TAB of the system. The TAB Specialist shall provide
a Design Review Report individually listing each deficiency and the
corresponding proposed corrective action necessary for proper system
operation.
3.2
TAB RELATED HVAC SUBMITTALS
The TAB Specialist shall prepare a list of the submittals from the Contract
Submittal Register that relate to the successful accomplishment of all HVAC
TAB. The submittals identified on this list shall be accompanied by a
letter of approval signed and dated by the TAB Specialist when submitted to
the Government. The TAB Specialist shall also ensure that the location and
details of ports, terminals, connections, etc., necessary to perform TAB
are identified on the submittals.
3.3
TAB SCHEMATIC DRAWINGS AND REPORT FORMS
A schematic drawing showing each system component, including balancing
devices, shall be provided for each system. Each drawing shall be
accompanied by a copy of all report forms required by the TAB Standard used
for that system. Where applicable, the acceptable range of operation or
appropriate setting for each component shall be included on the forms or as
an attachment to the forms. The schematic drawings shall identify all
testing points and cross reference these points to the report forms and
procedures.
3.4
DUCTWORK LEAK TESTING
**************************************************************************
NOTE: Delete this paragraph when Ductwork Leak
Testing is not required by Section 15895 AIR SUPPLY,
DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEM.
**************************************************************************
The TAB Specialist shall witness the Ductwork Leak Testing specified in
Section 15895 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEM and
approve the results as specified in Paragraph TAB RELATED HVAC SUBMITTALS.