1.4.2.2
Record of Document Submittal to Testing Agency
Submit not later than [30] [_____] calendar days prior to the work plan
submittal due date, a record of transmittal of the following documents to
the approved independent testing agency. Information is required to
develop a testing work plan and prepare for field testing.
a.
including marked design changes. Changes current as of the date
of transmission.
b.
Copies of all project submittals relating to the industrial
ventilation system. Transmit copies of final record submittals
including approval sheets.
1.4.2.3
Work Plan
Submit not later than [120] [_____] calendar days after contract award, but
before start of work, steps to be taken by the lead engineer to accomplish
the required testing. Submit the following:
a.
Memorandum of test procedure.
(1)
(2) Plan view showing proposed test locations (i.e. static
pressure locations).
(3)
Proposed pitot traverse reading locations.
b.
Test equipment to be used.
c.
Scaffolding and other Contractor's support equipment required to
perform test.
d.
Factory representatives and other Contractor's support personnel
who will be on site for testing.
1.4.2.4
List of Test Instruments
Submit a signed and dated list of test instruments, their application,
manufacturer, model, serial number, range of operation, accuracy and date
1.4.3
Test Requirements
**************************************************************************
NOTE: This guide specification is not intended to
devices. Refer to guide specifications specific to
**************************************************************************
**************************************************************************
NOTE: This guide specification does not address
testing the heating and cooling equipment in the
industrial ventilation system. Refer to Section
15950, "HVAC Testing/Adjusting/Balancing," to test
heating and cooling equipment. Coordinate the
SECTION 15951N
Page 9