e.
Otto Fuel II.
2. Permanently installed asbestos delagging
facilities.
3.
Metal cleaning or electroplating shops.
4.
Foundries.
5.
6.
7.
Carpentry shops.
8.
Advanced composite operations (e.g., graphite).
9. Indoor Firing Ranges.
Include this specification with the construction
project and require the Contractor to hire an
independent subcontractor. This specification
Modify this specification for an acceptance or
performance test contract for any industrial
ventilation system.
**************************************************************************
PART 1
GENERAL
1.1
REFERENCES
**************************************************************************
NOTE: Issue (date) of references included in
provided by the latest guide specification. Use of
SpecsIntact automated reference checking is
recommended for projects based on older guide
specifications.
**************************************************************************
The publications listed below form a part of this specification to the
extent referenced. The publications are referred to within the text by the
basic designation only.
AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL(AMCA)
AMCA 201
(2002) Fans and Systems
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH-2092S
(1998) Industrial Ventilation:
A Manual
of Recommended Practice
1.2
DEFINITIONS
a.
Capture velocity: Air velocity at any point in front of the hood
or at the hood opening necessary to overcome opposing air currents
SECTION 15951N
Page 4