"Factory Test Plans".
2.6.5
Factory Test Reports
Use the test reporting forms approved in the factory test plan. Final test
report forms shall be typed including data entries and remarks. Completed
test report forms for each CRACU shall be reviewed, approved, and signed by
the Manufacturer's test director.
]PART 3
EXECUTION
3.1
INSTALLATION
3.1.1
CRACU System
Installation of each CRACU system including equipment, materials,
installation, workmanship, fabrication, assembly, erection, examination,
inspection, and testing, shall be in accordance with ASME B31.1, ASME B31.5,
NFPA 70, as modified and supplemented by the requirements of this section
and the CRACU manufacturer's recommendations.
3.1.2
Provide a manufacturer's installation manual for each type of CRACU.
3.1.3
Connections to Existing Systems
Notify the Contracting Officer in writing at least 15 calendar days prior
to the date the connections are required. Obtain approval before
interrupting service. Furnish materials required to make connections into
existing systems and perform excavating, backfilling, compacting, and other
incidental labor as required. Furnish labor and tools for making actual
connections to existing systems.
3.2
FIELD QUALITY CONTROL
Upon completion and before final acceptance of work, test each CRACU
subsystem in service to demonstrate compliance with the contract
requirements, including field testing specified below. Adjust controls and
balance systems prior to final acceptance of completed systems. Test
demonstrate performance of required function. Correct defects in work
provided by Contractor and repeat tests. Furnish steam, fuel, water,
electricity, instruments, connecting devices, and personnel for tests.
Flush and clean piping before placing in operation. Clean equipment,
piping, strainers, and ducts. Prior to commencement of field testing,
remove all filters and provide new filters.
3.3
FIELD TESTING
Provide field test plan[s], field test schedule[s], field test[s] and field
test report[s] on each of the CRACU[s]. Field test each CRACU for
Contracting Officer acceptance in accordance with the CRACU manufacturer's
approved field test plan.
3.3.1
Manufacturer's Field Test Plans
Submit field test plans developed by the manufacturer for each CRACU;
[submit the field test plans along with the factory test plans specified
SECTION 15702N
Page 19