Section 01330 SUBMITTAL PROCEDURES:
**************************************************************************
NOTE: For LANTNAVFACENGC0M projects, Contractor
submittals for the CRACU's shall be Contracting
Officer approved by LANTNAVFACENGCOM Mechanical
Design Branch, in spite of who is the Designer of
Record. Ensure that Section 01330 SUBMITTAL
PROCEDURES, paragraph "Submittals Reserved for
LANTNAVFACENGCOM Approval" covers this submittal
requirement.
**************************************************************************
SD-03 Product Data
SD-06 Test Reports
**************************************************************************
capacity greater than 52,700 W 180,000 Btuh
**************************************************************************
[
CRACU production schedule and factory test schedule; G
Manufacturer's factory test plans; G
Factory test reports; G]
Field test schedule; G
Manufacturer's field test plans; G
Field test reports; G
SD-07 Certificates
Certificate of Specification Compliance; G
Credentials of the manufacturer's field test representative; G
SD-08 Manufacturer's Instructions
Installation manual for each type of CRACU
SD-10 Operation and Maintenance Data
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
1.4
OZONE DEPLETION FACTOR
Equipment using refrigerants R-11, R-12, R-113, R-114, R-115, R-500, or
refrigerants with ozone depletion factor (ODF) greater than 0.05 shall not