equipment and their basic operating features. [Six] [_____]
complete copies of maintenance manual in bound 216 x 279 mm (8-1/2
x 11 inch) 8-1/2 x 11 inch booklets listing routine maintenance
procedures, possible breakdowns and repairs, and a trouble
shooting guide. The manuals shall include piping and equipment
layouts and simplified wiring and control diagrams of the system
as installed.
1.3
SAFETY REQUIREMENTS
Exposed moving parts, parts that produce high operating temperature, parts
which may be electrically energized, and parts that may be a hazard to
operating personnel shall be insulated, fully enclosed, guarded, or fitted
with other types of safety devices. Safety devices shall be installed so
safety requirements shall be in accordance with AWS Z49.1.
1.4
DELIVERY, STORAGE, AND HANDLING
Stored items shall be protected from the weather, humidity and temperature
variations, dirt and dust, or other contaminants. Proper protection and
care of all material both before and during installation shall be the
Contractor's responsibility. Any materials found to be damaged shall be
replaced at the Contractor's expense. During installation, piping and
similar openings shall be capped to keep out dirt and other foreign matter.
1.5
PROJECT REQUIREMENTS
1.5.1
Verification of Dimensions
The Contractor shall become familiar with all details of the work, verify
all dimensions in the field, and advise the Contracting Officer of any
discrepancy before performing any work.
1.5.2
Drawings
The Contractor shall submit drawings consisting of:
details.
b. Plans and elevations which identify clearances required for
maintenance and operation.
interconnected or interlocked relationships between components.
d. Foundation drawings, bolt-setting information, and foundation
bolts prior to concrete foundation construction for equipment
indicated or required to have concrete foundations.
e. Details, if piping and equipment are to be supported other
than as indicated, which include loadings and type of frames,
brackets, stanchions, or other supports.
f.
Automatic temperature control diagrams and control sequences.
g. Installation details which includes the amount of factory set
superheat and corresponding refrigerant pressure/temperature.
SECTION 15700A
Page 11