A schedule, at least [2] [_____] weeks prior to the start of
related testing, for the system performance tests. The schedules
shall identify the proposed date, time, and location for each test.
Demonstrations[; G][; G, [_____]]
A schedule, at least [2] [_____] weeks prior to the date of the
proposed training course, which identifies the date, time, and
location for the training.
SD-06 Test Reports
Refrigerant Tests, Charging, and Start-Up[; G][; G, [_____]]
[Six] [_____] copies of each test containing the information
described below in bound 216 x 279 mm (8-1/2 x 11 inch) 8-1/2 x 11
inch booklets. Individual reports shall be submitted for the
refrigerant system tests.
a.
The date the tests were performed.
b.
A list of equipment used, with calibration certifications.
c.
Initial test summaries.
d.
Repairs/adjustments performed.
e.
Final test results.
System Performance Tests[; G][; G, [_____]]
[Six] [_____] copies of the report provided in bound 216 x 279
mm (8-1/2 x 11 inch) 8-1/2 x 11 inch booklets. The report shall
document compliance with the specified performance criteria upon
completion and testing of the system. The report shall indicate
the number of days covered by the tests and any conclusions as to
the adequacy of the system. The report shall also include the
following information and shall be taken at least three different
times at outside dry-bulb temperatures that are at least 3 degrees
C 5 degrees F apart:
a.
Date and outside weather conditions.
b.
The load on the system based on the following:
(1) The refrigerant used in the system.
(2) Condensing temperature and pressure.
(3) Suction temperature and pressure.
(4) Ambient, condensing and coolant temperatures.
(5) Running current, voltage and proper phase sequence for each
phase of all motors.
c.
The actual on-site setting of operating and safety controls.
d. Thermostatic expansion valve superheat - value as determined
by field test.
e.
Subcooling.
SECTION 15700A
Page 9