literature shall be included containing catalog cuts and
certification that the isolation characteristics of the isolators
provided meet the manufacturer's recommendations.
Spare Parts
Spare parts data for each different item of equipment specified.
Posted Instructions
Posted instructions, at least [2] [_____] weeks prior to
construction completion, including equipment layout, wiring and
control diagrams, piping, valves and control sequences, and typed
instructions shall include preventative maintenance procedures,
methods of checking the system for normal and safe operation, and
procedures for safely starting and stopping the system. The
posted instructions shall be framed under glass or laminated
plastic and be posted where indicated by the Contracting Officer.
Verification of Dimensions
A letter, at least [2] [_____] weeks prior to beginning
construction, including the date the site was visited,
conformation of existing conditions, and any discrepancies found.
Manufacturer's multi-year warranty for compressor(s) in
air-cooled liquid chillers as specified.
Schedules, at least [2] [_____] weeks prior to the factory test,
which identify the date, time, and location for each test.
Schedules shall be submitted for both the Chiller Performance Test
and the Chiller Sound Test. [The Chiller Performance Test
schedule shall also allow the witnessing of the test by a
Government Representative.]
System Performance Tests
A schedule, at least [2] [_____] weeks prior to the start of
related testing, for the system performance tests. The schedules
shall identify the proposed date, time, and location for each test.
Demonstrations
A schedule, at least [2] [_____] weeks prior to the date of the
proposed training course, which identifies the date, time, and
location for the training.
SD-06 Test Reports
[Six] [_____] copies of the report shall be provided in bound
216 x 279 mm (8 1/2 x 11 inch) 8 1/2 x 11 inch booklets. Reports
shall certify the compliance with performance requirements and
SECTION 15620A
Page 8