manifold for radiant floor heating systems.
The data shall show model, size, options, etc., that are
intended for consideration. Data submitted shall be adequate to
demonstrate compliance with contract requirements. Data shall
manufacturer's recommendations for operation and maintenance
clearances for each item.
Spare Parts
Spare parts data for each different item of material and
equipment specified.
Water Treatment System
Boiler Water Treatment
[Six] [_____] complete copies of the proposed water treatment
plan. The plan shall include a layout, control scheme, a list of
the existing water conditions including the items listed in
paragraph BOILER WATER TREATMENT, a list of all chemicals, the
proportion of chemicals to be added, the final treated water
handling the chemicals.
Fuel System Tests
Unit Heaters
system tests, at least 2 weeks prior to the start of related
testing.
Welding
A copy of qualified welding procedures, at least 2 weeks prior
to the start of welding operations.
and welding operators, at least 2 weeks prior to the start of
welding operations.
Qualifications
A statement from the firms proposed to prepare submittals and
perform installation and testing, demonstrating successful
completion of similar services of at least five projects of
similar size or scope, at least 2 weeks prior to the submittal of
any other item required by this section.
Field Instructions
piping, and ductwork and typed condensed operation manuals
explaining preventative maintenance procedures, methods of
checking the system for normal, safe operation, and procedures for
safely starting and stopping the system, framed under glass or