other rotating parts exposed to personnel contact shall be fully enclosed
or guarded. High temperature equipment and piping exposed to contact by
personnel or where a fire hazard will be created shall be properly guarded
or covered with insulation of a type specified. Items such as catwalks,
operating platforms, ladders, and guardrails shall be provided where shown
and shall be constructed in accordance with Section 05500A MISCELLANEOUS
METAL.
1.3.5
Verification of Dimensions
The Contractor shall become familiar with all details of the work, verify
all dimensions in the field, and shall advise the Contracting Officer of
any discrepancy before performing any work.
1.3.6
Welding
**************************************************************************
NOTE: If need exists for more stringent
requirements for weldments, delete the first
bracketed statement and the welding submittal.
**************************************************************************
[Piping shall be welded in accordance with qualified procedures using
performance-qualified welders and welding operators. Procedures and
welders shall be qualified in accordance with ASME BPVC SEC IX. Welding
procedures qualified by others, and welders and welding operators qualified
by another employer may be accepted as permitted by ASME B31.1. The
Contracting Officer shall be notified 24 hours in advance of tests and the
tests shall be performed at the work site if practical. The welder or
welding operator shall apply his assigned symbol near each weld he makes as
a permanent record. Structural members shall be welded in accordance with
Section 05090A WELDING, STRUCTURAL.] [Welding and nondestructive testing
procedures are specified in Section 05093 WELDING PRESSURE PIPING.]
1.3.7
Manufacturer's Services
Services of a manufacturer's representative who is experienced in the
installation, adjustment, and operation of the equipment specified shall be
provided. The representative shall supervise installing, adjusting, and
testing the equipment.
1.3.8
Field Training
**************************************************************************
NOTE: The number of hours required to instruct a
Government representative in operation and
maintenance of the system will depend on the
complexity of the system specified. Designer is to
establish the number of hours of training based on
equipment manufacturer recommendations, system
complexity and consultation with the installation.
**************************************************************************
Contractor shall conduct a training course for the maintenance and
operating staff. The training period of [_____] hours normal working time
shall start after the system is functionally complete but before the final
acceptance tests. The training shall include all of the items contained in
the approved Operating and Maintenance Instructions as well as
demonstrations of routine maintenance operations. Contracting Office shall