"Manufacturer's Certifications."
1.5.4
Qualifications of Field Supervisors
Submit the name and certified written resume of the engineer or technician,
listing education, factory training and installation, start-up, and testing
supervision experience for at least two projects involving compressors
similar to those in this contract.
1.5.5
Training Material
Submit a detailed training program syllabus for training of government
personnel, including instructional materials at least three weeks prior to
start of tests.
1.5.6
System Installation
Submit certification of air compressor system performance conforming to
ASME PTC 9. Submit certification of proper system installation in
accordance with paragraph entitled "Supervision."
1.5.7
Air Compressor System
Submit operation and maintenance data in accordance with Section 01781
OPERATION AND MAINTENANCE DATA. Air compressor system data shall contain
evidence that proprietary maintenance arrangements with the manufacturer
will be necessary. Compressors which will require proprietary maintenance
arrangement with the manufacturer require Government review and approval.
The compressors may be disapproved if circumstances do not justify approval
of compressors with limited availability of maintenance.
1.6
SAFETY
Construct all components of the unit in accordance with the requirements of
OSHA 29 CFR 1910.219. Requirements include shaft coupling guards as
specified in Section 15050N BASIC MECHANICAL MATERIALS AND METHODS,
insulation and jacketing with manufacturer standard covering or aluminum
sheet of all surfaces at 52 degrees C 125 degrees F and higher within a
height of 2.10 meter 7 feet from floor level, and use of electrical safety
devices. Thermal insulation, furnished by equipment manufacturer, shall
conform to ASTM C 553, Type I (flexible resilient), Class B-5 (up to 204
degrees C 400 degrees F), 32 kg/m3 2 pcf nominal. Cement insulation to
surface with MIL-A-3316, Class 2, adhesive and fasten with 16 gage wire
bands at maximum 405 mm 16 inches on center spacing. Cover insulation with
ASTM B 209M ASTM B 209 sheet aluminum jacket.
1.7
EQUIPMENT ARRANGEMENT
Arrangement selected shall maintain 0.90 meters 3 foot clearance for access
passage and 1.20 meters 4 foot clearance for personnel to operate
equipment. There are substantial physical and connection point differences
The Contractor shall be responsible for selecting equipment and submitting
arrangement drawings covering required changes for approval by the
Contracting Officer. Changes from the equipment arrangement shown on the
contract drawings shall be performed by the Contractor at no additional
cost to the Government.
SECTION 15214N