The test supervisor shall certify performance by test to be in
compliance with specifications.
SD-07 Certificates
Work plan
Factory test procedures
Factory testing certification
Qualifications of field supervisors
Field test procedures
Training material
Year 2000 (Y2K) Compliance Warranty; G
Air compressor system
Air compressor system installation
SD-10 Operation and Maintenance Data
**************************************************************************
NOTE: Obtain approval of equipment with proprietary
maintenance requirements from the appropriate
contracts office.
**************************************************************************
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
SD-11 Closeout Submittals
Submit text.
1.5
QUALITY ASSURANCE
1.5.1
Intake and Discharge Pipe Calculations
Submit intake and discharge pipe calculations to show intake and discharge
piping are not subject to damaging resonance pulsations. Include effects
of pulsation dampers and surge chambers, if required to limit pulsation.
1.5.2
Work Plan
Submit a written schedule of dates of installation, start-up, checkout, and
test of equipment.
1.5.3
Factory Testing Certification
Submit a statement that the air compressor factory is equipped to perform
all required factory tests. Submit in accordance with paragraph entitled
SECTION 15214N
Page 9