function beyond Year 2000, the following paragraph
must be included when this section is part of a
construction contract. For more information on Y2K,
see these web sites on the Internet.
http://www.doncio.navy.mil/y2k/year2000.htm, the
Year 2000 homepage of the Department of the Navy
Chief Information Officer (DONCIO);
http://www.itpolicy.gsa.gov/mks/yr2000.legal.htm,
the General Services Administration (GSA) Chief
Information Officer (CIO) homepage for Y2K
procurement, contracting, and legal issues;
http://y2k.lmi.org/gsa/y2kproducts contains
information on vendor product compliance
**************************************************************************
Provide computer controlled facility components, specified in this section,
that are Year 2000 compliant (Y2K). Computer controlled facility
components refers to software driven technology and embedded microchip
technology. This includes, but is not limited to, programmable
programmable logic controllers.
2.2
MATERIALS AND EQUIPMENT
Materials and equipment complete with accessories shall be selected by the
Contractor for performance compatibility.
2.3
AIR COMPRESSOR
type. Include the electric motor driver, integral gears and cases, staged
with prelubrication pump and shaft-driven lubrication pump, steel base and
accessories. The aftercoolers may be mounted separately to meet the
performance requirements.
2.3.1
Manufacturer's Certifications
The manufacturer shall certify that the air compressors proposed are of the
same design, construction, and frame size, and of equal or not more than 10
percent smaller in capacity as compressors which have been in satisfactory
continuous service for at least 2 years at not less than two locations.
Furnish the name of the owner, the address of the installation, and the
name of a person at the installation who can be contacted for verification.
The manufacturer shall also certify that the factory is equipped to perform
2.3.2
Guaranteed Performance
**************************************************************************
to complete the specification.
**************************************************************************
a.
Net Compressed Air Output (All seal losses shall be considered
internal and not included in the net output) (Minus zero plus 4
percent): [_____] liters per second (L/s) [_____] SCFM
SECTION 15213N