Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the
"G" designation identifies the office that will review the submittal for
the Government.] The following shall be submitted in accordance with
Section 01330 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Schematic and Drawings
Submit schematic and drawings as specified.
SD-03 Product Data
Materials and Mechanical Equipment
Electrical Equipment
Submit manufacturer's catalog data and descriptive literature
for all standard equipment and products to be incorporated in the
work, including all materials and equipment specified in
paragraphs MATERIALS AND MECHANICAL EQUIPMENT and ELECTRICAL
EQUIPMENT. This data shall include specifications and assembly
drawings showing sizes, ratings, parts and material lists, overall
dimensions, and mounting dimensions.
System Description
Design and Performance Requirements
designed by the Contractor.
**************************************************************************
NOTE: List all items for which the Contractor shall
**************************************************************************
Shop Assembly and Testing
Submit procedures for shop testing for all testing outlined in
paragraph SHOP ASSEMBLY AND TESTING.
Cleaning and Flushing the System
Submit procedures for field cleaning and flushing as outlined in
paragraph CLEANING AND FLUSHING THE SYSTEM. Submit a detailed
field cleaning procedure not less than [_____] days before start
of cleaning operations.