SAE J514
(2001) Hydraulic Tube Fittings
UNDERWRITERS LABORATORIES (UL)
UL 50
(1995; Rev thru Sep 2003) Enclosures for
Electrical Equipment
UL 6
(2000; Rev thru May 2003) Rigid Metal
Conduit
1.2
LUMP SUM PRICES
**************************************************************************
NOTE: If Section 01270 MEASUREMENT AND PAYMENT is
paragraph title (UNIT PRICES) should be deleted from
this section and the remaining appropriately edited
subparagraphs below should be inserted into Section
01270.
**************************************************************************
1.2.1
1.2.1.1
Payment
Payment will be made for costs associated with the hydraulic power
system(s) as specified.
1.2.1.2
Unit of Measure
Unit of measure:
lump sum.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
SECTION 15010A
Page 8