PART 1
GENERAL
1.1
REFERENCES
**************************************************************************
NOTE: Issue (date) of references included in
provided by the latest guide specification. Use of
SpecsIntact automated reference checking is
recommended for projects based on older guide
specifications.
**************************************************************************
The publications listed below form a part of this specification to the
extent referenced. The publications are referred to within the text by the
basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M
(2004) Structural Welding Code - Steel
ASME INTERNATIONAL (ASME)
ASME B30.11
(1998) Monorails and Underhung Cranes
ASME HST-2
(1999; R 2004) Hand Chain Manually
ASME HST-3
(1999; R 2004) Manually Lever Operated
ASTM INTERNATIONAL (ASTM)
ASTM A 275/A 275M
(2003) Magnetic Particle Examination of
Steel Forgings
MONORAIL MANUFACTURERS ASSOCIATION (MMA)
MMA MH27.1
(2003) Underhung Cranes and Monorail
Systems
1.2
VERIFICATION OF DIMENSIONS
The Contractor shall verify all building dimensions that relate to
fabrication of the monorail system, and shall notify the Contracting
Officer of any discrepancy before the order to the monorail manufacturer is
finalized.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
SECTION 14534N