request for formal inspection at least [_____] [15] working days prior to
inspection date. An experienced technician regularly employed by the
system installer shall be present during the inspection. At the
inspection, repeat any or all of the required tests as directed.
[Provide plastic containers, hose fittings, and hose at each nozzle to
capture the wet chemical and discharge each system to demonstrate uniform
distribution of the wet chemical among the nozzles.] Furnish compressed
air, nitrogen, [wet chemical] equipment, and personnel for the tests.
Refill and reset systems after tests have been completed.
-- End of Section --
SECTION 13971N
Page 9