modified herein. Each system shall include materials, accessories, and
equipment necessary to provide each system complete and ready for use.
Provide each system to give full consideration to blind spaces, piping,
electrical equipment, ducts, and other construction and equipment in
accordance with detailed working drawings to be submitted for approval.
Devices and equipment for fire protection service shall be UL Fire Prot Dir
listed or FM P7825 approved for use with wet chemical fire extinguishing
systems. In the NFPA publications referred to herein, the advisory
provisions shall be considered to be mandatory, as though the word "shall"
had been substituted for "should" wherever it appears; reference to the
"authority having jurisdiction" shall be interpreted to mean the [_____]
Division, Naval Facilities Engineering Command, Fire Protection Engineer.
1.2.1
Detail Drawing
showing components, pipe sizes, pipe lengths, nozzle and valvelocations in
relation to cooking appliances and fusible link locations.
1.3
SUBMITTALS
**************************************************************************
NOTE: Submittals must be limited to those necessary
for adequate quality control. The importance of an
item in the project should be one of the primary
factors in determining if a submittal for the item
should be required.
A "G" following a submittal item indicates that the
submittal requires Government approval. Some
submittals are already marked with a "G". Only
delete an existing "G" if the submittal item is not
complex and can be reviewed through the Contractor's
submittal is sufficiently important or complex in
context of the project.
For submittals requiring Government approval on Army
projects, a code of up to three characters within
the submittal tags may be used following the "G"
designation to indicate the approving authority.
Codes for Army projects using the Resident
Management System (RMS) are: "AE" for
Architect-Engineer; "DO" for District Office
(Engineering Division or other organization in the
District Office); "AO" for Area Office; "RO" for
Resident Office; and "PO" for Project Office. Codes
following the "G" typically are not used for Navy
projects.
Submittal items not designated with a "G" are
considered as being for information only for Army
projects and for Contractor Quality Control approval
for Navy projects.
**************************************************************************
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control
approval.][for information only. When used, a designation following the