After successful completion of the final acceptance tests,
submit test results in booklet form showing field tests performed
were in compliance with the specified performance criteria. In
each test report, indicate the final position of controls.
SD-07 Certificates
Installer qualifications; G
Test procedures; G
Installation certificate; G
Installation personnel; G
Current UL listings or FM approvals; G
SD-10 Operation and Maintenance Data
Alarm receiving and decoding console, Data Package 5; G
[
Rectifier/Charger, Data Package 5; G
Fire alarm boxes, Data Package 5; G
Submit in accordance with Section 01781 OPERATION AND
MAINTENANCE DATA.
SD-11 Closeout Submittals
1.6
QUALITY ASSURANCE
1.6.1
Qualifications
1.6.1.1
Installer Qualifications
Prior to installation, submit evidence including system type and design
showing that the installer has successfully installed at least two exterior
fire reporting and receiving alarm systems conforming to the requirements
of the NFPA and of the same type and design specified herein. Include the
names and locations of the installations and written certification from the
users that the systems have performed satisfactorily for a period of not
less than 18 months. Ensure the installer is UL certified for the
installation and testing of Fire Alarm Systems. Provide proof of this
listing. A list of installer's personnel shall be provided as part of the
submittal package.
1.6.1.2
Installation Personnel
Submit names of personnel who will supervise installation and testing of
the system, and who will furnish instruction to Government personnel, along